Which two are true about the Risk badge in vRealize Operations? (Choose two.)

A.The Risk badge indicates potential future problems that may degrade the performance of the
system.
B.Risks may require attention in the near future.
C.The Risk badge indicates problems that are degrading performance of the system.
D.Risks require attention now to correct system performance problems.
Answer: A,B
Explanation:
The Risk badge indicates potential problems that might eventually degrade the performance of the
system. Risk does not necessarily imply a current problem. Risk indicates problems that might
require your attention in the near future, but not immediately.
Reference:https://pubs.vmware.com/vsphere-
60/index.jsp?topic=%2Fcom.vmware.vsphere.vcops.doc%2FGUID-30184AD9-6790-48DC-96C5-
4A38DEEFEA3A.html

Leave a Reply

Your email address will not be published. Required fields are marked *